September, what a month!! Anagram is glad it’s over, as is its work of making good for construction drawings (GFCs) for Cuttack toilet. It was such an amazing month filled with loads of detailing, discussions, management within the in-house design team and the consultants’  decision-making, and refining, refining, refining the designs.

Taking into consideration the lifestyle of an entirely different strata of society in the detailing meant trying to view things from the user’s perspective while keeping foresightedness in mind. This led to the Anagram team working tirelessly and, ultimately, adding more members to the team. This meant that half of the office was working on the project! The doubling of the team was done not only to meet the deadline but also to provide further assistance in refining the designs.

(more…)

Architecture & Design Status Report

August has been an incredibly busy month for Anagram Architects and CDD. The tender documents were prepared for the 32 Community Toilet sites in Cuttack and Anagram anchored the process of preparing a bulk of this, and compiling that with inputs from CDD and Codesign, for the sewage treatment systems & signage respectively. With this, all the work for the tender stage has been completed for 11 of the Community Toilet typologies.

The first round of the documents were submitted to the CMC, with the support of Arkitechno. Most of the latter part of the August was spent in revising and correcting some of the estimates in order to work towards the total sanctioned amount of the Preliminary Project Report for Cuttack.

(more…)

Architectural Design & Tender Progress

The last month has been exceptional in terms of progress of the architectural work. The deadlines for Project Sammann have always been challenging, but this time the work was fourfold and the deadline was even tighter.

Earlier we submitted tender and good for construction drawings (GFCs) for the Public Toilets, which were six designs covering 27 sites. This time for the community toilets (CTs) in Cuttack and Bhubaneswar we had 14 designs covering 32 and 43 sites, respectively, with the same stringent deadline as with the Public Toilets. On top of that, the whole process was delayed by two weeks due to various reasons. However, Anagram took the responsibility to bring the whole project back on track.

(more…)